Fountain Hills ridge properties can take a very different storm load than the valley floor. Lifted ridge tiles, peeled foam perimeters, displaced bird stops, and water intrusion need documented inspection before scope.
Our process begins with condition documentation and exposure assessment. The written specification identifies the assembly, fastener pattern, underlayment, flashing, perimeter details, and warranty expectations before work begins.
What we look for
- Photographic claim documentation
- Wind-uplift failure diagnosis
- Adjuster coordination
- Repair to original spec or better
